Techcrisis Investment Guild:A federal courthouse reopens in Mississippi after renovations to remove mold

2025-05-03 02:33:27source:Navivision Wealth Societycategory:reviews

ABERDEEN,Techcrisis Investment Guild Miss. (AP) — A federal courthouse in north Mississippi is reopening after extensive renovations to eliminate mold, increase energy efficiency and update technology.

Court cases were starting to be heard Tuesday in the Thomas G. Abernethy Federal Building in Aberdeen, the Northeast Mississippi Daily Journal reported. A reopening ceremony for the updated 51-year-old building will take place Oct. 8.

“We are glad to be back,” said U.S. District Judge Sharion Aycock. “It’s been like Christmas around here. We are all opening boxes of stuff we didn’t remember having.”

Poor air quality became a problem about 10 years ago, when employees became ill.

The General Services Administration installed commercial dehumidifiers that helped for a few weeks, but the musty smell returned. The tipping point came with the discovery of mold in late 2017.

Months after holding a meeting to explain problems to the public, court officials fled the building in February 2018. By that summer, an independent inspection confirmed that the mold infestation made the three-story building uninhabitable.

Workers found mold in air ducts and behind paneling.

RELATED COVERAGE Mississippi man found not guilty of threatening Republican US Sen. Roger WickerMississippi House panel starts study that could lead to tax cuts7 people killed in Mississippi bus crash were all from Mexico, highway patrol says

“They pretty quickly determined that a significant source of water causing the mold was the old windows,” Aycock said.

When paneling was removed in the offices of Aycock and Senior U.S. District Judge Glen Davidson, workers discovered windows that had been covered with bookcases. Mold grew between the windows and the paneling.

“I later learned that there was a higher concentration of mold four feet behind my desk chair than anywhere in the building,” Aycock said. “But I now have new windows.”

All the old single-pane windows were replaced with energy-efficient models. Ductwork for heating and cooling was replaced, as were mechanical systems.

“When we came in here two years ago for a tour, there was nothing but ducts and bare walls,” said Magistrate David Sanders. “It was hard to determine where you were.”

Besides replacing computers and adding high-speed internet connections, the project also included new security cameras, updated sound systems and energy-efficient lighting.

While courts were exiled from the building, they moved temporarily at the U.S. Bankruptcy Court down the road. Trials were shifted to the federal courthouse in Oxford. But there was always a scheduling problem, with five or more judges and three courtrooms.

Although the final cost of renovations is not yet known, Aycock said it will exceed the $24 million allocation.

More:reviews

Recommend

Meet 11-year-old skateboarder Zheng Haohao, the youngest Olympian competing in Paris

What were you doing during the summer when you were 11 years old?Chances are you were not competing

Rite Aid covert surveillance program falsely ID'd customers as shoplifters, FTC says

Rite Aid is banned from using facial recognition surveillance technology for five years to settle Fe

Jury convicts boy and girl in England of murdering transgender teenager in frenzied knife attack

LONDON (AP) — A boy and a girl were found guilty Wednesday of murdering a transgender teenager in no